ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN

1. The Democratic Republic of Congo is implementing the Multisectoral Child Health and Nutrition Project (the Project), with the involvement of the Ministry of Health, Hygiene and Prevention through the Health System Strengthening for Better Maternal and Child Health Results Project (PDSS) project implementation unit (PIU), as set out in the Financing Agreement and the Grant Agreement. The International Development Association has agreed to provide an additional financing (P178816) for the Project, as set out in the referred agreements. This ESCP supersedes previous versions of the ESCP for the Project and shall apply both to the original and the additional financing for Project referred to above.

2. The Recipient shall ensure that the Project is carried out in accordance with the Environmental and Social Standards (ESSs) and this Environmental and Social Commitment Plan (ESCP), in a manner acceptable to the Association. The ESCP is a part of the Financing Agreement and the Grant Agreement. Unless otherwise defined in this ESCP, capitalized terms used in this ESCP have the meanings ascribed to them in the referred agreements.

3. Without limitation to the foregoing, this ESCP sets out material measures and actions that the Recipient shall carry out or cause to be carried out, including, as applicable, the timeframes of the actions and measures, institutional, staffing, training, monitoring and reporting arrangements, and grievance management. The ESCP also sets out the environmental and social (E&S) instruments that shall be adopted and implemented under the Project, all of which shall be subject to prior consultation and disclosure, consistent with the ESS, and in form and substance, and in a manner acceptable to the Association. Once adopted, said E&S instruments may be revised from time to time with prior written agreement by the Association.

4. As agreed by the Association and the Recipient, this ESCP will be revised from time to time if necessary, during Project implementation, to reflect adaptive management of Project changes and unforeseen circumstances or in response to Project performance. In such circumstances, the Recipient and the Association agree to update the ESCP to reflect these changes through an exchange of letters signed between the Association and the Recipient. The Recipient shall promptly disclose the updated ESCP.

Click here to download the complete document - PDF format


UG PDSS – PMNS
right
Article suivant Plan de Mobilisation des Parties Prenantes (PMPP)
left
Article précédent Polémique sur le juge naturel d'un ancien Premier ministre : " c'est le juge ordinaire qui doit le juger ", pense le bâtonnier Matadi Wamba

Les plus commentés

Religion « Désormais aucune association confessionnelle ne peut s’installer dans un rayon de 500 mètres par rapport à une autre », ( Constant Mutamba)

21.07.2024, 7 commentaires

Politique Prorogation de la trêve humanitaire entre FARDC et M23 : « Les USA jouent le jeu de l'ennemi » (CVAR)

19.07.2024, 5 commentaires

Politique Agression rwandaise : Vital Kamerhe obtient les assurances de l'Union européenne pour le retour de la paix dans l'Est de la RDC

20.07.2024, 5 commentaires

Politique Le Président Félix Tshisekedi aux membres du gouvernement : "Chacun sera jugé sur la base des résultats obtenus"

22.07.2024, 5 commentaires

Ils nous font confiance